{"id":"roadmap","title":"Progress must be earned in stages","wording":"MASQ is a working integrated candidate; formal Stage 1 and production release still require explicit qualification gates.","maturity":"roadmap","summary":"Substantial implementation has crossed earlier roadmap boundaries unevenly; release gates describe required evidence, not a promised date.","meaning":"The path from an integrated candidate to an independent, qualified production release depends on explicit scale, operator, provider, device, review, and authorization evidence.","trueToday":["Scoped implementations exist across the creator-protocol stack.","The repaired 50-user preflight and six-hour endurance qualification are completed evidence in separate campaign scopes.","The 500-user qualification was in progress in the dated 12 October 2026 status snapshot."],"notYet":["Formal Stage 1, independent operator/custodian proof, and a release-approved disappearance gate.","Real authoritative credential integrations, production providers, unified consumer/mobile qualification, professional review, or mainnet readiness.","Guaranteed dates or automatic graduation between stages."],"whyMaturity":"Completed scoped campaigns do not combine into production approval. The remaining milestones are conditional qualification and operating gates.","nextProof":"Satisfy the next explicit acceptance gates with reproducible implementation, conformance and operational evidence before advancing the stated stage.","relatedExperience":{"label":"Read the staged roadmap","href":"/roadmap"},"supportingEvidence":[{"label":"Inspect stages and acceptance gates","href":"/roadmap","description":"Conditional milestones with clear limits on what Stage 0 has proved."},{"label":"Inspect the actual current proof","href":"/demo#identity","description":"The public fixture remains the independently reproducible website proof; broader implementation is summarized with separate scope boundaries."}],"technicalEvidence":[],"evidence":"/evidence/public-scope.md","basis":"Conditional qualification and release gates"}